Underpinning Permit Process Toronto - Complete Guide
Navigating the City of Toronto Permit Requirements

Complete guide to getting underpinning permits in Toronto. Learn required documents, engineering requirements, fees, timelines, and inspection processes. Expert guidance through Toronto's complex permit system for foundation underpinning projects.
Underpinning Permit Process Toronto - Complete Guide in progress
โš ๏ธ Licensed & Insured
โšก Fast Response
Foundation crack Wall damage Basement leak Structural damage

Why Toronto Homeowners Trust DrySpace

25+ Years in Business
12,847 Projects Completed
$5M Insurance Coverage
24/7 Emergency Response

WSIB Certified

Full workplace safety insurance coverage for all workers

CSA Approved

Canadian Standards Association certified materials & methods

ISO 9001:2015

International quality management system certification

BBB A+ Rating

Better Business Bureau accredited with highest rating

Underpinning Permit Process Toronto - Complete Guide

Complete guide to getting underpinning permits in Toronto. Learn required documents, engineering requirements, fees, timelines, and inspection processes. Expert guidance through Toronto’s complex permit system for foundation underpinning projects.

Key Requirements

โœ“ Professional Engineer (P.Eng) mandatory
โœ“ 6-12 week typical timeline
โœ“ $170.07 per $1,000 construction value
โœ“ Multiple inspections required
โœ“ Party wall agreements for attached homes

Critical Documents Needed

  • Building Permit Application
  • Engineering drawings (6 sets)
  • Geotechnical report
  • Property survey
  • Insurance certificates
  • WSIB clearance

Service Areas

Service Areas: Toronto, North York, Scarborough, Etobicoke, East York, York, Mississauga, Brampton, Vaughan, Richmond Hill, Markham, and surrounding areas.

Underpinning permits are complex but manageable with proper preparation and professional guidance. Don’t risk illegal work - the consequences far exceed the permit costs and timeline.

Related Services

Complete Solutions for Your Basement

Since we're already working on your basement, consider these complementary services that save time and money when done together.

Navigating the City of Toronto Permit Requirements Navigating the City of Toronto Permit Requirements results

Navigating the City of Toronto Permit Requirements

Getting an underpinning permit in Toronto isn’t just bureaucracy - it’s a complex process designed to prevent catastrophic failures. One missing document, one incorrect calculation, or one unsigned form can delay your project by months. This guide walks you through every requirement, every form, and every inspection.

We’ve shepherded hundreds of underpinning permits through Toronto’s system. We know what building examiners look for, which engineers the city trusts, and how to avoid the common pitfalls that cause rejections. Whether you’re a homeowner trying to understand the process or a contractor new to underpinning, this guide provides the roadmap.

Remember: Starting underpinning without permits isn’t just illegal - it’s dangerous and can make your property unmortgageable and unsellable.

Overview of Permit Requirements Overview of Permit Requirements results

Overview of Permit Requirements

Why Underpinning Permits Are Complex

Multiple Departments Involved:

  • Building Division (structural review)
  • Zoning Department (setback compliance)
  • Toronto Water (sewer connections)
  • Urban Forestry (tree protection)
  • Transportation Services (road occupancy)

Professional Requirements:

  • Professional Engineer (P.Eng) mandatory
  • BCIN qualified designer
  • Licensed contractor only
  • Insurance verification required
  • WSIB clearance needed

Timeline Reality:

  • Application preparation: 2-4 weeks
  • Initial review: 10-15 business days
  • Revision cycles: 5-10 days each
  • Total typical: 6-12 weeks
  • Rush available: Additional fees

Costs Breakdown:

  • Permit fees: $170.07 per $1,000 construction value
  • Minimum fee: $198.59
  • Engineering review: Additional charges
  • Development charges: May apply
  • Tree permits: If applicable
Required Documents Checklist Required Documents Checklist results

Required Documents Checklist

Complete Application Package

1. Application Forms

  • Building Permit Application (signed)
  • Schedule 1: Designer Information
  • Schedule 2: Building Data Matrix
  • Commitment to General Review (engineer)
  • Owner Authorization Form

2. Engineering Drawings (6 Sets)

  • Site plan with dimensions
  • Existing foundation plan
  • Proposed underpinning plan
  • Structural sections and details
  • Shoring/support plans
  • Construction sequence drawings

3. Supporting Documents

  • Property survey (current)
  • Geotechnical report
  • Structural calculations
  • Party Wall Agreements
  • Insurance certificates
  • WSIB clearance letter

4. Additional Requirements

  • Zoning review certificate
  • Tree declaration/permit
  • Erosion control plan
  • Traffic management plan (if needed)
  • Archaeological clearance (heritage areas)

Each Document Must Be:

  • Signed and sealed by P.Eng
  • Current (within 6 months)
  • Original signatures
  • Proper scale (1:50 typical)
  • Clear and legible
Engineering Requirements Engineering Requirements results

Engineering Requirements

The Foundation of Your Application

Choosing a Structural Engineer

Qualifications Required:

  • Licensed P.Eng in Ontario
  • Structural specialization
  • Underpinning experience
  • City of Toronto familiarity
  • Professional insurance

Engineer’s Responsibilities:

  • Site investigation
  • Soil analysis coordination
  • Structural design
  • Drawing preparation
  • General review commitment
  • Site inspections

Typical Engineering Costs:

  • Basic underpinning: $3,000-5,000
  • Complex projects: $5,000-10,000
  • Party wall situations: Additional $2,000
  • Inspections: $500-1,000 per visit
  • Revisions: $500-1,500 per round

What Engineers Calculate:

  • Existing foundation capacity
  • Soil bearing pressure
  • New footing sizes
  • Reinforcement requirements
  • Shoring specifications
  • Sequential excavation limits
Drawing Specifications Drawing Specifications results

Drawing Specifications

What Building Examiners Expect

Site Plan Requirements

  • Scale 1:200 or larger
  • Property lines dimensioned
  • Building setbacks shown
  • Existing trees marked
  • Neighboring buildings indicated
  • North arrow included

Foundation Plans Must Show:

  • Existing foundation depths
  • Proposed underpinning areas
  • Section cut references
  • Dimension strings
  • Column/post locations
  • Sequential excavation zones

Structural Details Include:

  • Typical underpinning section
  • Connection to existing
  • Reinforcement details
  • Concrete specifications
  • Waterproofing callouts
  • Drainage provisions

Construction Sequence:

  • Maximum excavation lengths
  • Support requirements
  • Concrete pour schedule
  • Inspection hold points
  • Critical dimensions
  • Safety provisions
Party Wall Agreements Party Wall Agreements results

Party Wall Agreements

When Neighbors Are Affected

When Required:

  • Semi-detached homes
  • Row houses/townhomes
  • Zero lot line properties
  • Excavation within 45ยฐ of neighbor
  • Shared foundation walls

Agreement Components:

  • Property descriptions
  • Scope of work
  • Access provisions
  • Damage responsibilities
  • Insurance requirements
  • Dispute resolution

Process Timeline:

  1. Notice to Neighbor: 2 months before
  2. Agreement Negotiation: 2-4 weeks
  3. Legal Review: 1-2 weeks
  4. Signatures: Both parties
  5. City Submission: With permit

Typical Costs:

  • Legal fees: $1,500-3,000
  • Surveyor (condition report): $1,000-2,000
  • Neighbor’s legal review: You may pay
  • Monitoring equipment: $500-1,500
  • Total: $4,000-8,000

If Neighbor Refuses:

  • Mediation options
  • Legal remedies available
  • City won’t issue permit
  • Project delayed indefinitely
  • Professional negotiation helps
Zoning Considerations Zoning Considerations results

Zoning Considerations

Hidden Permit Complications

Zoning Review Triggers:

  • Creating basement apartment
  • Increasing floor area
  • Changing use (residential to commercial)
  • Adding parking
  • Modifying setbacks

Common Zoning Issues:

  • Floor Space Index (FSI) exceeded
  • Height increases (even underground)
  • Parking requirements
  • Landscaping minimums
  • Angular plane violations

Committee of Adjustment:

  • Required for variances
  • 3-4 month process
  • $3,000-5,000 costs
  • Neighbor notifications
  • No guarantee of approval

Development Charges:

  • Additional floor area created
  • Calculated per square meter
  • Can be $10,000+
  • Due before permit issuance
  • Payment plans available
Submission Process Submission Process results

Submission Process

Step-by-Step Navigation

1. Pre-Application Consultation

  • Book appointment online
  • Bring preliminary drawings
  • Discuss project scope
  • Identify potential issues
  • Get fee estimate

2. Application Preparation

  • Complete all forms
  • Compile documents
  • Make required copies
  • Calculate fees
  • Review checklist

3. Submission Options

  • In-person: Toronto Building counter
  • Online: For some projects
  • Courier: Not recommended
  • Agent submission: Common

4. Initial Review (10-15 days)

  • Completeness check
  • Zoning review
  • Structural review begins
  • Comments generated
  • Applicant notified

5. Revision Process

  • Address comments
  • Resubmit documents
  • Additional review (5-10 days)
  • May require multiple rounds
  • Patience essential
Building Examiner Review Building Examiner Review results

Building Examiner Review

What They Look For

Structural Elements:

  • Load calculations accuracy
  • Soil report adequacy
  • Sequential excavation logic
  • Shoring specifications
  • Connection details

Code Compliance:

  • Minimum dimensions
  • Reinforcement requirements
  • Concrete specifications
  • Safety provisions
  • Inspection protocols

Common Rejection Reasons:

  • Incomplete drawings
  • Missing calculations
  • Inadequate shoring plans
  • No construction sequence
  • Unsigned documents

Examiner Questions:

  • Soil bearing verification?
  • Monitoring plan included?
  • Neighbor protection adequate?
  • Drainage addressed?
  • Inspections scheduled?

Tips for Approval:

  • Over-document everything
  • Clear, detailed drawings
  • Address obvious concerns
  • Professional presentation
  • Respond quickly to comments
Permit Fees Calculation Permit Fees Calculation results

Permit Fees Calculation

Understanding the Costs

Base Calculation:

  • Construction value ร— $170.07 per $1,000
  • Minimum: $198.59
  • Residential rate applies

Construction Value Includes:

  • Excavation costs
  • Concrete work
  • Labor estimates
  • Engineering portion
  • Waterproofing

Example Calculation:

1
2
Underpinning value: $40,000
Permit fee: $40,000 รท 1,000 ร— $170.07 = $6,802.80

Additional Fees:

  • Zoning review: $200-500
  • Re-inspection: $100-200
  • Revision fees: $100-300
  • After-hours inspection: $200+
  • Conditional permits: Extra charges

Payment Methods:

  • Credit card
  • Debit
  • Certified cheque
  • Cash (not recommended)
  • Payment plans (large projects)
Inspection Requirements Inspection Requirements results

Inspection Requirements

Critical Hold Points

Mandatory Inspections:

1. Excavation Inspection

  • Before any shoring
  • Each section opened
  • Verify depths
  • Check soil conditions
  • Engineer often required

2. Reinforcement Inspection

  • Before concrete pour
  • Verify bar placement
  • Check coverage
  • Confirm specifications
  • Photo documentation

3. Concrete Placement

  • During pour sometimes
  • Slump tests required
  • Cylinder samples taken
  • Mix tickets verified
  • Weather conditions noted

4. Backfill Inspection

  • Compaction testing
  • Material verification
  • Drainage confirmation
  • Waterproofing check
  • Grade establishment

5. Final Inspection

  • All work complete
  • Drainage functional
  • Site restored
  • Documentation provided
  • Permit closed

Scheduling Inspections:

  • 48 hours notice required
  • Online booking available
  • Morning slots fill first
  • Weather may delay
  • Inspector has final say
Special Circumstances Special Circumstances results

Special Circumstances

Complex Permit Situations

Heritage Properties:

  • Heritage Impact Assessment required
  • Heritage architect involvement
  • HPS review process
  • Additional 2-3 months
  • Strict requirements

Archaeological Concerns:

  • Areas of potential
  • Assessment required
  • Monitoring during dig
  • Significant delays possible
  • Cost implications

Tree Protection:

  • Arborist report required
  • Protection plan mandatory
  • Injury bonds posted
  • Urban Forestry approval
  • Penalties severe

Environmental Issues:

  • Contaminated soil
  • High water table
  • Special disposal required
  • MOE involvement possible
  • Costs escalate quickly

Emergency Permits:

  • Structural failure
  • Immediate danger
  • Engineer assessment first
  • Expedited review
  • Work can begin sooner
Common Permit Mistakes Common Permit Mistakes results

Common Permit Mistakes

Avoiding Delays and Rejections

Application Errors:

  • Wrong forms used
  • Missing signatures
  • Outdated documents
  • Incorrect fees
  • Incomplete packages

Drawing Problems:

  • Insufficient detail
  • Missing dimensions
  • No engineer seal
  • Wrong scale
  • Illegible prints

Documentation Issues:

  • Expired surveys
  • Missing party wall agreements
  • No insurance proof
  • Unsigned forms
  • Missing schedules

Process Mistakes:

  • Starting work early
  • Skipping inspections
  • Not calling for reviews
  • Ignoring conditions
  • Poor communication

Consequences:

  • Stop work orders
  • Fines and penalties
  • Permit revocation
  • Legal action
  • Project delays
Contractor Requirements Contractor Requirements results

Contractor Requirements

Who Can Pull Permits

Licensing Requirements:

  • City of Toronto business license
  • Specific trade licenses
  • Insurance minimums met
  • WSIB clearance
  • Clean record

Insurance Minimums:

  • General liability: $2 million
  • Completed operations
  • Property damage coverage
  • Professional liability
  • City as additional insured

Contractor Responsibilities:

  • Permit posting
  • Inspection coordination
  • Code compliance
  • Safety requirements
  • Documentation maintenance

Using Unlicensed Contractors:

  • Permit denied
  • No insurance coverage
  • Legal liability
  • Quality issues
  • No recourse
Timeline Management Timeline Management results

Timeline Management

Realistic Expectations

Typical Timeline:

  • Week 1-2: Document preparation
  • Week 3-4: Engineer drawings
  • Week 5: Submission
  • Week 7-8: Initial review
  • Week 9-10: Revisions
  • Week 11-12: Approval

Expediting Options:

  • Pre-consultation meeting
  • Complete submissions
  • Experienced engineer
  • Quick revision response
  • Professional expediter

Delays to Expect:

  • Summer vacations
  • Holiday seasons
  • Complex projects
  • Neighbor issues
  • Zoning complications

Planning Recommendations:

  • Start 3 months early
  • Budget for delays
  • Have contingencies
  • Stay engaged
  • Be patient
Permit Conditions Permit Conditions results

Permit Conditions

Understanding Restrictions

Standard Conditions:

  • Engineer inspections required
  • Survey verification needed
  • Specific inspection stages
  • Time limits imposed
  • Change restrictions

Special Conditions:

  • Monitoring requirements
  • Neighbor protection
  • Environmental controls
  • Traffic management
  • Noise restrictions

Compliance Requirements:

  • Follow conditions exactly
  • Document compliance
  • Report issues immediately
  • Request changes formally
  • Keep records

Violation Consequences:

  • Work stoppage
  • Permit revocation
  • Legal action
  • Fines imposed
  • Future permits affected
Post-Approval Process Post-Approval Process results

Post-Approval Process

From Permit to Project

Upon Approval:

  1. Pay all fees
  2. Collect permit documents
  3. Review conditions carefully
  4. Post permit on site
  5. Schedule pre-start meeting

Starting Construction:

  • Notify neighbors
  • Arrange inspections
  • Confirm engineer availability
  • Order materials
  • Mobilize carefully

During Construction:

  • Keep permit visible
  • Document everything
  • Call inspections timely
  • Address issues quickly
  • Maintain communication

Project Completion:

  • Final inspections
  • Submit documentation
  • Close permit properly
  • Keep records forever
  • File warranty
Working with City Staff Working with City Staff results

Working with City Staff

Building Relationships

Best Practices:

  • Be professional always
  • Respond quickly
  • Provide clear information
  • Respect their expertise
  • Follow procedures

Communication Tips:

  • Email preferred
  • Reference permit numbers
  • Be concise
  • Include all parties
  • Document conversations

When Issues Arise:

  • Stay calm
  • Seek clarification
  • Propose solutions
  • Escalate if needed
  • Keep records

Building Trust:

  • Submit quality work
  • Meet commitments
  • Fix problems promptly
  • Show appreciation
  • Build reputation
The Bottom Line The Bottom Line results

The Bottom Line

Keys to Permit Success

Start Early The permit process takes months, not weeks. Begin immediately after deciding to underpin.

Hire Professionals Experienced engineers and contractors navigate the system efficiently, avoiding costly mistakes.

Be Thorough Complete applications get approved faster. Missing documents cause weeks of delays.

Stay Engaged Respond to city comments quickly. Delayed responses push you to the back of the queue.

Document Everything Keep copies of all submissions, correspondence, and approvals. You’ll need them for years.

Remember: The permit process protects you, your neighbors, and your investment. While frustrating, it ensures safe, legal construction that maintains your property value and mortgageability.

Testimonials

What Our Customers Say

4.9/5 Average Rating
2800+ Happy Customers
Lifetime Warranty
FAQ

Frequently Asked Questions

Get answers to common questions about underpinning permit process toronto - complete guide.

  • Typically 6-12 weeks from submission to approval. This includes 2-4 weeks for application preparation, 10-15 business days for initial review, and 5-10 days for each revision cycle. Complex projects or those requiring variances can take 3-4 months.
  • Permit fees are $170.07 per $1,000 of construction value with a minimum fee of $198.59. For a typical $40,000 underpinning project, expect permit fees around $6,800. Additional costs include engineering ($3,000-10,000), surveys, and potential development charges.
  • Yes, a Professional Engineer (P.Eng) licensed in Ontario is mandatory. They must prepare sealed drawings, calculations, and commit to general review. The engineer will design the underpinning, supervise construction, and certify completion. This is non-negotiable for permit approval.
  • Required documents include: building permit application, Schedule 1 & 2 forms, 6 sets of engineering drawings, property survey, geotechnical report, structural calculations, party wall agreements (if applicable), insurance certificates, and WSIB clearance. All must be current and properly signed.
  • Party wall agreements are required for semi-detached homes, townhouses, zero lot line properties, or when excavating within 45 degrees of a neighbor’s foundation. The agreement must be signed by both parties and submitted with your permit application.
  • Mandatory inspections include: excavation (before shoring), reinforcement (before concrete), concrete placement (during pour), backfill (compaction testing), and final inspection. Each requires 48 hours notice and some require the engineer present.
  • No. Starting without a permit is illegal and dangerous. Consequences include stop work orders, fines up to $50,000, forced removal of work, inability to sell or mortgage property, and potential criminal charges if someone is injured.
  • Zoning variances require Committee of Adjustment approval, adding 3-4 months to your timeline. This costs $3,000-5,000 and requires neighbor notification. Common triggers include exceeding floor space index or creating basement apartments.
  • No. Contractors must have a City of Toronto business license, appropriate trade licenses, $2 million liability insurance minimum, WSIB clearance, and a clean record. Using unlicensed contractors results in permit denial and legal liability.
  • Rejections usually result from incomplete drawings, missing calculations, or inadequate documentation. You’ll receive specific comments to address. Resubmission typically takes 5-10 days for review. Multiple rounds of revisions are common for complex projects.