Government Rebates Available - Up to $3,400 Back on Waterproofing

Permit Acquisition & Technical Drawings

Complete Permit Services from Drawings to Approval

Professional Permit & Drawing Services

We handle the entire permit process from initial drawings to final approval. Our licensed engineers and permit specialists ensure your project meets all City of Toronto requirements, saving you time and avoiding costly delays.

1,200+
Permits Approved
98%
First-Time Approval
5-10 Days
Average Approval
P.Eng
Licensed Engineers

Underpinning Permits

Complete structural engineering and permit package for basement lowering projects.

  • • Structural drawings
  • • Engineer's report
  • • Excavation plans
  • • Shoring details
  • • Inspection scheduling

Demolition Permits

Fast-track demolition permits with all required documentation and notifications.

  • • Site survey
  • • Utility disconnections
  • • Neighbor notifications
  • • Environmental clearance
  • • Hoarding permits

Drainage Permits

Storm water management and drainage system permits with engineered solutions.

  • • Site grading plans
  • • Storm calculations
  • • Catch basin details
  • • Connection permits
  • • TRCA approval

Underpinning Permits & Engineering

Underpinning requires comprehensive engineering and multiple City inspections. Our P.Eng certified engineers prepare complete permit packages that ensure first-time approval and smooth project execution.

Complete Underpinning Package Includes:

  • Structural Engineering Drawings

    Detailed plans showing excavation sequence, shoring, and new foundation

  • Load Calculations & Analysis

    Complete structural analysis with safety factors and load paths

  • Section Details & Specifications

    Concrete specs, rebar schedules, waterproofing details

  • Party Wall Agreements

    Neighbor notifications and agreements for attached properties

Underpinning Permit Package: $3,500-5,500

Includes all drawings, engineering, and City submission

Underpinning Permit Process

1

Site Assessment

Survey existing conditions, soil report

1-2 days

2

Engineering Design

Create structural drawings and calculations

3-5 days

3

City Submission

Submit complete package to Building Department

Same day

4

Review & Approval

City review and permit issuance

5-10 business days

5

Inspection Scheduling

Coordinate required inspections

Throughout project

Required Inspections:

  • • Excavation inspection
  • • Footing inspection (each pour)
  • • Wall inspection
  • • Backfill inspection
  • • Final inspection

Demolition Permit Requirements

Complete Demolition

  • • Building permit application
  • • Site plan and survey
  • • Utility disconnect letters
  • • Rodent control declaration
  • • Environmental clearance
  • • Tree removal permit (if required)
  • • Heritage clearance (if applicable)

Interior/Selective Demo

  • • Floor plans showing demo areas
  • • Structural review for load-bearing
  • • Dust control plan
  • • Waste disposal plan
  • • Asbestos survey (if required)

Fast Track Available: Same-day permit for qualifying projects

Demolition Permits

Demolition permits require careful coordination of multiple departments and utilities. We handle all aspects including utility disconnections, environmental clearances, and neighbor notifications.

What We Handle:

  • Toronto Hydro disconnection
  • Enbridge gas disconnection
  • Water service capping
  • Hoarding permit if required
  • 30-day neighbor notification
$1,500-3,500
Complete demo permit
5-15 days
Typical approval

Drainage & Storm Water Permits

Storm Sewer Connection

New connections to City storm sewers require engineered drawings and capacity analysis.

  • • Connection detail drawings
  • • Flow calculations
  • • Inverts and grades
  • • Backflow prevention
  • • Inspection chambers
$2,000-3,500

Site Grading Plan

Comprehensive grading plans showing drainage patterns and storm water management.

  • • Topographic survey
  • • Proposed contours
  • • Drainage arrows
  • • Swale details
  • • Lot grading certificate
$1,500-2,500

TRCA/Conservation

Properties in regulated areas require additional environmental approvals.

  • • Flood plain analysis
  • • Erosion control plan
  • • Environmental impact
  • • Restoration plan
  • • Monitoring reports
$3,000-5,000

Drainage Permit Process

1

Site Analysis

Survey existing drainage patterns and infrastructure

2-3 days

2

Design Solution

Engineer drainage system and calculate capacities

3-5 days

3

Prepare Drawings

Create technical drawings and specifications

2-3 days

4

Submit & Track

Submit to City and manage approval process

5-10 days

Professional Technical Drawings

Drawing Services We Provide

Architectural Drawings

  • • Floor plans (existing & proposed)
  • • Elevations and sections
  • • Site plans and surveys
  • • As-built drawings

Structural Drawings

  • • Foundation plans and details
  • • Framing plans
  • • Beam and column schedules
  • • Connection details

Civil/Site Drawings

  • • Grading and drainage plans
  • • Utility layouts
  • • Erosion control plans
  • • Landscape plans

Our Drawing Standards

Professional Standards

  • AutoCAD 2024 latest version
  • OBC/NBC compliant
  • P.Eng stamped and signed
  • City of Toronto format
  • PDF and DWG formats

Delivery Options

Standard (5-7 days) Included
Rush (2-3 days) +25%
Emergency (24 hours) +50%

Permit Expediting Service

Same-Day Submission

Documents prepared and submitted within 24 hours

Direct City Contact

We handle all communications with City staff

Guaranteed Approval

We fix any issues at no extra charge

Transparent Permit Pricing

Service TypeBasic PackageComplete PackageTimeline
Underpinning Permit$3,500$5,5007-10 days
Complete Demolition$1,500$3,5005-15 days
Interior Demolition$800$1,5003-5 days
Storm Connection$2,000$3,5005-10 days
Site Grading Plan$1,500$2,5003-5 days
Building Permit (Minor)$500$1,0002-3 days

Basic Package Includes:

  • ✓ Technical drawings
  • ✓ Permit application
  • ✓ City submission
  • ✓ One revision round

Complete Package Includes:

  • ✓ Everything in Basic
  • ✓ Engineering stamps
  • ✓ Expedited processing
  • ✓ Unlimited revisions
  • ✓ Inspection coordination

Why Choose Our Permit Services?

Licensed Engineers

P.Eng certified structural engineers on staff for all stamped drawings

Fast Approvals

98% first-time approval rate with 5-10 day average turnaround

Fixed Pricing

No hidden fees or surprise charges - transparent upfront pricing

Our Permit Success Record

1,200+
Permits Approved
98%
First Approval
5 Days
Avg. Turnaround
24/7
Online Tracking
100%
Satisfaction

Start Your Permit Application Today

Professional drawings • Fast approvals • Licensed engineers • Fixed pricing

Free Consultation
P.Eng Engineers
98% Approval Rate
Emergency Free Inspection