Foundation Settlement Repair - Stop Your Home From Sinking
Is your foundation settling? Doors sticking? Floors sloping? Foundation settlement is a serious problem that worsens over time. Our engineered pier systems stop settlement permanently and can lift your home back to level.
Foundation Settlement Warning Signs
Visual Indicators
- Diagonal Wall Cracks: Running from door/window corners
- Stair-Step Cracks: In brick or block walls
- Floor Gaps: Separation between floor and walls
- Ceiling Cracks: Where walls meet ceiling
- Chimney Lean: Pulling away from house
Functional Problems
- Doors Won’t Close: Frame distortion from movement
- Windows Stick: Difficult to open or close
- Sloping Floors: Visible lean or feel when walking
- Plumbing Issues: Pipes stressed by movement
- Roof Problems: Distortion affecting shingles
Exterior Signs
- Foundation Cracks: Visible outside
- Brick Separation: Gaps in mortar joints
- Porch/Stoop Pulling Away: From main structure
- Driveway Cracks: Near foundation
- Landscaping Changes: Water pooling patterns
What Causes Foundation Settlement?
Soil Problems (Most Common in Toronto)
- Clay Shrinkage: Drought causing soil contraction
- Poor Compaction: Inadequate preparation during construction
- Erosion: Water washing away supporting soil
- Tree Roots: Large trees removing moisture
- Organic Decay: Buried materials decomposing
Water Issues
- Poor Drainage: Excess water softening soil
- Plumbing Leaks: Underground pipe failures
- Improper Grading: Water flowing toward foundation
- Missing Gutters: Roof water eroding soil
Construction Factors
- Inadequate Footings: Too small for load
- Poor Concrete: Low quality or improper mix
- Fill Soil: Building on non-compacted fill
- Age: Natural deterioration over decades
How Much Settlement Is Too Much?
Acceptable Settlement
- 1/4 inch or less: Monitor annually
- Uniform settlement: Less concerning if even
Concerning Settlement
- 1/2 inch differential: Requires evaluation
- Active movement: Ongoing changes
- Functional problems: Doors/windows affected
Critical Settlement
- 1 inch or more: Immediate action needed
- Rapid progression: Worsening monthly
- Structural damage: Wall/ceiling separation
Our Settlement Repair Solutions
Push Pier Systems
How They Work:
- Steel piers hydraulically driven to bedrock
- Transfers home weight to stable strata
- Can lift foundation back to level
- No excavation of entire foundation
Best For:
- Heavy structures
- Deep bedrock (10-30 feet)
- Maximum lifting capacity
- Severe settlement (2+ inches)
Process:
- Excavate small holes at pier locations
- Drive piers to bedrock/load-bearing strata
- Attach lifting brackets to foundation
- Hydraulically lift and stabilize
- Lock in place permanently
Cost: $1,500-$2,500 per pier Timeline: 2-5 days typical project
Helical Pier Systems
How They Work:
- Screw-shaped piers twisted into ground
- Multiple helixes for load bearing
- Less invasive than push piers
- Immediate load transfer
Best For:
- Lighter structures
- Limited access areas
- New construction
- Moderate settlement (1-2 inches)
Process:
- Small excavation at pier points
- Mechanically screw in piers
- Monitor torque for capacity
- Attach to foundation
- Lift if needed
Cost: $1,200-$2,000 per pier Timeline: 1-3 days typical
Slabjacking/Mudjacking
How They Work:
- Pump grout under settled concrete
- Fills voids and lifts slab
- Less invasive than replacement
- Quick results
Best For:
- Concrete slabs and walkways
- Garage floors
- Minor settlement (under 4 inches)
- Cost-effective solution
Process:
- Drill small holes in concrete
- Pump polyurethane or cement slurry
- Monitor lifting carefully
- Patch injection holes
- Ready for use same day
Cost: $500-$1,500 per area Timeline: 2-4 hours
Wall Anchor Systems
How They Work:
- Steel anchors in stable soil
- Connected through foundation wall
- Counteracts soil pressure
- Can straighten walls over time
Best For:
- Bowing basement walls
- Lateral movement
- Combined with piers
- Accessible yard space
Cost: $500-$700 per anchor Timeline: 1-2 days
The Settlement Repair Process
1. Engineering Assessment
- Detailed measurement of settlement
- Soil analysis and testing
- Load calculations
- Custom repair plan
- Cost estimate
2. Preparation
- Utility marking and protection
- Access creation
- Equipment positioning
- Neighbor notification
- Interior protection
3. Installation
- Systematic pier placement
- Monitoring during driving/screwing
- Precise lifting coordination
- Load transfer verification
- Final stabilization
4. Restoration
- Backfill and compaction
- Concrete patching
- Landscaping repair
- Interior crack filling
- Final inspection
Why Immediate Action Matters
Progressive Damage
Settlement accelerates over time:
- Year 1: Minor cracks, doors stick
- Year 2-3: Visible slopes, wall cracks
- Year 4-5: Major structural damage
- Beyond: Potential collapse risk
Cost Multiplication
- Early intervention: $5,000-$15,000
- Moderate damage: $15,000-$30,000
- Severe damage: $30,000-$60,000+
- Rebuilding: $100,000+
Associated Problems
- Water infiltration through cracks
- Pest entry points
- HVAC efficiency loss
- Plumbing failures
- Electrical hazards
Warranty & Guarantees
Lifetime Warranty Includes
- No further settlement
- Transferable to new owners
- Annual inspection option
- Emergency support
- 25-year product warranty
Documentation Provided
- Engineer’s report
- Installation details
- Warranty certificate
- Maintenance guide
- Insurance paperwork
Cost Factors
What Affects Pricing
- Number of piers needed
- Depth to stable soil
- Access limitations
- Severity of settlement
- Additional repairs needed
Typical Project Costs
- Small (5-8 piers): $8,000-$15,000
- Medium (10-15 piers): $15,000-$30,000
- Large (20+ piers): $30,000-$50,000
- With lifting: Add 20-30%
Financing Available
- 0% for 12 months OAC
- Extended payment plans
- Insurance claim assistance
- Bundle with other repairs
Settlement vs. Other Foundation Issues
Settlement Characteristics
- Affects entire sections
- Progressive worsening
- Diagonal crack patterns
- Functional problems
Not Settlement
- Horizontal cracks (pressure)
- Vertical cracks (shrinkage)
- Surface spalling
- Seasonal movement
Prevention After Repair
Maintain Proper Drainage
- Clean gutters regularly
- Extend downspouts 6+ feet
- Grade away from foundation
- Install French drains
Control Moisture
- Consistent soil moisture
- Strategic watering in drought
- Tree root barriers
- Fix plumbing leaks
Regular Monitoring
- Annual level checks
- Crack documentation
- Door/window function
- Professional inspections
DIY vs. Professional Repair
Why Professional Only
- Engineering required
- Specialized equipment
- Permit requirements
- Warranty protection
- Safety concerns
DIY Risks
- Continued settlement
- Improper installation
- No warranty
- Potential collapse
- Wasted money
Insurance Coverage
Often Covered
- Plumbing leak damage
- Some natural disasters
- Sudden occurrences
Rarely Covered
- Normal settlement
- Poor maintenance
- Earth movement
- Gradual damage
We Help With Claims
- Documentation
- Engineer reports
- Adjuster meetings
- Proper coding
Emergency Settlement Repair
Signs You Need Emergency Service:
- Sudden drop (overnight change)
- Rapidly widening cracks
- Doors won’t open/close
- Visible structure lean
- Wall/ceiling separation
Our Emergency Response:
- 24/7 availability
- 2-hour response time
- Temporary stabilization
- Safety assessment
- Permanent solution planning
Get Your Free Settlement Inspection
Don’t wait for settlement to worsen. Our structural engineers will assess your foundation FREE and provide honest recommendations.
📞 Call Now: (437) 545-0067
✉️ Email: settlement@dryspacewaterproofing.ca
🏠 Serving all of Greater Toronto Area
Remember: Foundation settlement never improves on its own - it only gets worse and more expensive to fix. Call today for peace of mind.
DrySpace Waterproofing - Lifting homes and spirits since 1998